Project Management Consultancy

Mast Parks provides theme park project management through Project Management Consultancy (PMC). We oversee civil work, time management, scheduling and quality control, so the design becomes the park that was drawn.

What it is
Oversight of civil work, time management, scheduling and quality control, with supervision and material selection expertise, so the design translates into reality
Who it is for
Private landowners, existing park owners, family businesses, government and tourism bodies, and temples and religious trusts
Where it applies
All eight park types Mast Parks covers: theme parks, water parks, amusement parks, adventure parks, themed family entertainment centres, ecological parks, experience centres and spiritual parks

What theme park project management is

Theme park project management is the work of making sure the park that gets built is the park that was designed. Mast Parks provides it as Project Management Consultancy (PMC).

A good design can be lost in construction. Project Management Consultancy (PMC) keeps the build true to the plan. Mast Parks provides theme park project management by overseeing civil work, time management, scheduling and quality control, with expertise in supervision and material selection, so that the design translates into reality.

PMC sits in the Design and Execution stage of the 13 Mast Parks services. It follows Architectural Designing, whose drawings, materials list and quantities are what the consultants check the build against. The next service is Ride and Attraction Planning.

What theme park project management covers

Civil work

PMC oversees the civil work: the foundations, structures, paths, water systems and the other works that form the park. The consultants check that the work follows the drawings and that problems are found early.

Time management and scheduling

A park has many parts that depend on one another: structures before finishes, finishes before theming, theming before rides are installed. PMC sets the schedule, tracks it and raises delays early, so that the park can open on a date the owner can plan around.

Quality control

PMC checks the quality of workmanship and materials against the design. Themed parks depend on detail, and a finish that does not match the drawing weakens the theme. Quality control catches this on site, while it can still be corrected.

Supervision and material selection

PMC brings expertise in supervision and in the selection of materials. Materials in a park have to withstand weather, wear and constant use, and still look right for the theme. Choosing them well matters to both the cost and the look.

How PMC runs

  1. Step 1

    Take over the design

    Work from the approved architectural design, with its working drawings, GMC and BOQs.

  2. Step 2

    Set the schedule

    Set the build schedule and the order in which the parts of the park are completed.

  3. Step 3

    Oversee the build

    Supervise the civil work on site against the schedule and the drawings.

  4. Step 4

    Control quality

    Check workmanship and materials against the design, and have defects corrected.

  5. Step 5

    Report to the owner

    Keep the owner informed of progress, delays and decisions that need the owner's approval.

  6. Step 6

    Prepare for handover

    Prepare the park for the transition to operations.

What you bring and what you receive

An owner brings the architectural design, the contractors the owner has appointed, and the authority to make decisions quickly when the site raises questions. The owner's availability affects the pace of the build.

The owner receives supervision of the build on the owner's behalf: schedule tracking, quality checks and regular reports. Where the project calls for it, Mast Parks places its own people on the site.

Who needs theme park project management

Theme park project management is needed once building starts, by owners who want an expert team watching quality, schedule and materials.

PMC is used by private landowners, existing park owners, family businesses, government and tourism bodies, and temples and religious trusts who want a team that understands both parks and construction to oversee the build. It applies to all eight park types.

Where Mast Parks has done this

Mast Parks provided project management consultancy, with on-site personnel, on a Mast amusement and adventure park in Karnataka. On a Mast amusement and adventure park in Karnataka, the work began from ground zero and included procurement and negotiations for rides.

Mast Parks also handled project management for a Mast water park in Rajasthan, and for a Mast ecological park in Telangana, where project management is currently on hold.

Decisions PMC helps you make

  • Is the build on schedule? The schedule is tracked and delays are reported.
  • Does the work match the drawings? Quality control compares the two.
  • Which material should we use? Material selection draws on supervision experience.
  • Where must the owner decide? PMC flags the questions that need the owner's answer, so they do not hold up the work.
  • When is the park ready to open? PMC prepares the handover to operations.

What can go wrong without PMC

Without independent oversight, the contractor decides the order of work, the standard of finish and the material substitutions. Small changes accumulate, and the park that opens is not quite the park that was approved. Delays are found late, when the opening date is already fixed.

PMC does not replace the contractor. It represents the owner on site and keeps the contractor to the plan.

Terms used on this page

  • PMC. Project Management Consultancy: oversight of a build on the owner's behalf.
  • Civil work. Construction of the foundations, structures, paths and similar works.
  • Quality control. Checking workmanship and materials against the design.
  • Procurement. Buying the rides, materials and equipment the park needs.
  • Handover. The transfer of the finished park to those who will run it.

Questions to ask before you start

Owners get more from this service when they arrive with answers, or at least with a view, on the points below. None of them needs to be settled in advance, and Mast Parks can help to settle them.

  • Has a contractor been appointed, and what does the contract say about supervision?
  • What is the target opening date, and how fixed is it?
  • How often does the owner want reports, and in what form?
  • Who on the owner's side can approve decisions on site?
  • Which parts of the park are most sensitive to quality?

Why one point of oversight matters

A park build brings together many parties: designers, contractors, ride suppliers, operators and the owner. Each is focused on its own part of the work. Without one team looking across all of it, small gaps between the parties tend to turn into delays and extra cost late in the build.

Project Management Consultancy gives the owner that single view. It keeps the build tied to the approved design, the agreed schedule and the agreed budget, and it brings problems to the owner while they are still small enough to fix.

This is also why Mast Parks treats it as a service of its own rather than an add-on. The team that oversees the build understands the park's design and its intended operation, so decisions on site are made with the finished park in mind.

The way Mast Parks runs this oversight is part of its professional method. This page describes what the service is for and what it gives the owner, not how each step is carried out.

Where this service sits among the 13

Mast Parks organises its work as 13 services in four stages, listed here in the order a project usually follows. Project Management Consultancy is shown in bold. An owner can start at any stage, but each stage builds on the one before it.

Most owners use several of these services together, and some use the full set from idea to opening. See all 13 on the services page.

Working with Mast Parks

Mast Parks works with the owner at each step. The owner approves the work before it moves to the next stage, and revisions are part of the process. The owner knows the site, the region and the ambition. Mast Parks brings experience of designing and delivering parks in India. The best results come when the two work as one team, with decisions made quickly and in the open.

To start a conversation, use the contact page. Mast Parks will ask about the site, the park you have in mind and where you are in the project.

How PMC links design to operations

PMC is also where the build starts to meet the operation. The way rides are installed, the way paths are finished and the way buildings are laid out affect how the park will be run. Consultants who understand parks can see these effects while the park is still being built. They can raise them early, when the fix is a change on site rather than a rebuild.

This is why PMC is placed between design and the later services. The next services, Ride and Attraction Planning, Team Hiring and Training and Operations Planning, prepare the park to run.

Frequently asked questions

What is Project Management Consultancy (PMC)?

PMC oversees civil work, time management, scheduling and quality control, with supervision and material selection expertise, so that the design translates into reality.

Does Mast Parks place people on site?

Yes. On a Mast amusement and adventure park in Karnataka, Mast Parks provided on-site personnel.

What does PMC check?

The progress of the civil work against the schedule, and the quality of work and materials against the design.

Is PMC different from being the contractor?

Yes. PMC represents the owner and oversees the contractors. It does not build.

When does PMC begin?

After architectural design is complete, when there are drawings, materials and quantities to check the build against.

Is PMC available for every park type?

Yes. It applies to all eight park types.

How long does PMC last?

Duration depends on the site, the park type and the scope of services. Mast Parks gives a timeline once the brief is clear.

Is PMC priced separately from design?

It depends on the project and the effort it needs: the park type, the size of the site and the services chosen. Mast Parks scopes each project with the owner, so the owner pays for the work that project needs. To discuss yours, use the contact page.